6 & 7 July 2021 | 1300 hrs | Muscat, Oman
This course is developed to provide detailed in-depth technical level knowledge of wireline operation in order to apply to the oil and gas industry. This course focuses on the wireline conveyance and intervention methods with a balanced approach on actual operation aspect for both engineer and operator positioning.
Day One
Sr. No. | Chapter | Name | Duration |
---|---|---|---|
1 | Chapter 1 | Introduction for well phase and well intervention methods | 10 min |
2 | Chapter 2 | Wireline. An introduction | 5 min |
3 | Chapter 3 | Advantages And Disadvantages of Wireline | 5 min |
4 | Chapter 4 | Wireline types and properties | 10 min | 5 | Chapter 5 | Wireline surface equipment | 20 min |
Day Two
Sr. No. | Chapter | Name | Duration |
---|---|---|---|
6 | Chapter 6 | Wireline Pressure control equipment | 20 min |
7 | Chapter 7 | Wireline downhole equipment | 20 min |
8 | Chapter 8 | Well control during wireline interventions – rigging up and pressure testing | 20 min |
Trainer
Copyright © 2023 Energy Hub. All Rights Reserved. Powered by Turquoise Technologies